Mountain View Attached ADU readiness starts with a complete, source-linked city packet and early screening for utility, site, and energy-code issues.
Source-linked guideLast checked 2026-04-30Published values available
62
Readiness score before quote
For Mountain View, package attached scope as a contractor-facing checklist before quote finalization. Treat city-specific notes as pre-bid exclusions unless verified.
Required documents
Free users see the starter item. Pro unlocks the full contractor checklist.
Building permit applicationThe ADU needs its own permit path and scope clarity.
Free
4 locked checklist items
Request a project packet for this job, or use Pro when you are checking multiple ADU quotes each month.
Trigger: Hillside, high fire risk, close property lines, floodplain, or special site conditions
Why it matters: Site-specific conditions can add departments, special details, or construction constraints that are invisible in a generic ADU checklist.
What to do next: Check parcel conditions and map layers before using a standard permit timeline in the customer quote.